PLEASED TO SHARE COMPLETED THE DELIVERY FMC PROJECT TO COLOMBIA
DUE TO THE LARGE SIZE OF THE UNIT, TRANSPORT WAS ONLY AVAILABLE AT 10:30 PM AND IT TOOK APPROXIMATELY 4.5 HOURS TO COMPLETE. THE BOILER FEATURED DIMENSIONS OF 12.4 X 6.3 X 5.2 M AND WEIGHED IN AT A WHOPPING 49 T.
MULTIPLE ROUTE SURVEYS WERE CARRIED OUT IN ADVANCE DUE TO SUBSTANTIAL REDEVELOPMENTS WITHIN CAIRO , SUCH AS NEW ROADS AND BYPASSES. THIS REQUIRED THE CAREFUL CONSIDERATION OF NUMEROUS HAZARDS: TRAFFIC LIGHTS & CONES, TELEPHONE WIRES (MOST OF WHICH HAD TO BE LIFTED BY CURTIS & LEES) AND MORE.
- 1 TANK
- 221 PCS OF STEEL STRUCTURE
SUCCESSFULLY HANDLED THE DELIVERY OF EQUIPMENT FOR THE EXTENSION PROJECT TO THE EL NOUR WATER TREATMENT IN EGYPT
TRANSPORTATION FROM SUPPLIERS BY STANDARD & MULTI-AXLE TRUCKS
PORT HANDLING & SHIPMENT ON HEAVY LIFT VESSELS
RECEIVING, CONSOLIDATION & SHIPPING VARIOUS PARTS IN CONTAINERS
FULL DOCUMENTATION INCLUDING EUR-1, ROAD PERMITS & ESCORTS UP TO DELIVERY ADRS IN SADAT CITY
LOADING & STUFFING 120 PIPES LINE INSIDE 6X40’ STANDARD CONTAINER
PICKUP CARGO: Dassendorf Germany
POL: ITGOA
POD: EGALEX
CARGO: PIPES
DIM: 11 X 30 CM diameter
LOADING & STUFFING 6REAL LINE INSIDE 3X40’ FLAT RACK CONTAINER
POL: EGALY
POD: DEHAM
CARGO: PIPES
TERM: DOOR TO DOOR
PLEASED TO SHARE COMPLETED THE DELIVERY FOR SURE CLEAN
PROJECT TO UK.
CARGO: OFFSHORE VESSEL FLOATING BYOUS
14 PAKAGES
POL: EGDAM
POD: GBFXT
EQU: 7X40’FR
SCOPE OF WORK INCLUDES:-PORT HANDLING IN DAMIETTA
-EXCEPTIONAL ROAD TRANSPORT
-LASHING & SECURING ON-BOARD
-CUSTOM CLEARANCE